Parking spaces blocked, access roads closed, sidewalks torn up, an excavator in the way? Hurray: fiber optics are (finally) coming to the neighborhood!

Network levels: NE3

Local residents are looking forward to this construction project

Network level 3 makes the hearts of all planners beat faster – with joy. Planning is fun: drawing routes, marking microducts, placing street cabinets, blowing fiber optics, defining home connections.

At network level 3, the hearts of everyone in the network documentation department is beating wildly. Where are all the old amplifiers that can no longer be replaced? Who is affected by the fact that a truck ran over this street cabinet?

The construction crews also have a lot to do here. How deep to dig, where to place the sleeve, and whether to branch left or right from the sidewalk to enter the property: a lot of information is needed here.

AND network levels – NE3: Local residents are looking forward to this construction site

The data situation is crucial, especially when different trades overlap. At the planning stage, it is not yet clear whether the home network should be built first or whether the fiber optic termination point should be installed first.

Dynamic network planning, which also provides up-to-date, accurate, and relevant information on site, is a considerable asset.

Ideally, any necessary red corrections can also be recorded, and documentation images and measurement reports can be stored. Also on site. One can always want more…

Pre-planning with AND WebSolution

Define routes and costs early, without specialist knowledge and without installation.